Print CB Request (LCC0105029 - Mechanical Infrastructure)

Print Controlling Board Request

Request Summary

Lakeland Community College respectfully requests Controlling Board approval to transfer $231,463.00 from Fund 7034, ALI C37919 (Engineering Building Renovations) to Fund 7034, ALI C37935 (Mechanical Infrastructure Replacement) and to release capital funds from Fund 7034, ALI C37935 (Mechanical Infrastructure Replacement) in FY 2026, in the amount of $925,000 to contract with Brewer Garrett Company to provide Design-Build services for the mechanical systems upgrades at Lakeland Community College in Kirtland, Lake County.

Funding

Fiscal Year Fund ALI Amount
2026 7034 - HIGHER EDUCATION IMPROVEMENT C37935 - Mechanical Infrastructure Replacement $925,000.00

Transfer

From Agency To Agency Fiscal Year Fund ALI Transfer Amount Prev. Released Amount
LCC   2026 7034 - HIGHER EDUCATION IMPROVEMENT C37919 - ENGINEERING BUILDING RENOVATIONS $231,463.00 $0.00
LCC 2026 7034 - HIGHER EDUCATION IMPROVEMENT C37935 - Mechanical Infrastructure Replacement $231,463.00 $0.00

Explanation

The requested transfer of $231,463 from C37919 Engineering Building Renovations to C37935 Mechanical Infrastructure Replacement will fully fund the first phase of this project and begin planning for the next phase. The Engineering Building Renovation was recently completed and the remaining appropriation in C37919 will not be needed for that project.

The Mechanical Infrastructure Replacement Project is anticipated to be a three to four biennia project to upgrade the campus mechanical infrastructure. Existing infrastructure is original to the 1960's and 70's campus construction and is beyond its useful life. Modern mechanical systems last longer, are more energy efficient, and provide increased comfort to students, faculty, and staff.

A Request for Qualifications was posted in the Ohio Register on August 26, 2025. Four (4) firms submitted Statements of Qualifications on September 23, 2025. Two (2) firms were shortlisted to submit proposals in response to the Request for Proposals issued on October 14, 2025. Through the interview and selection process, Brewer Garrett Company was selected based on their best value score and quality of the team to perform the required services.

Brewer-Garrett offered the best response for addressing Guaranteed Maximum Price 1 and developing a fee structure for implementation of the project. Per Section 357.45 of Sub HB 2, Lakeland Community College is contracting with Brewer Garrett up to $925,000 for preconstruction services for Guaranteed Maximum Pricing packages 1 and 2 and construction services for GMP 1.

Attachments

Type File Name (link)
Planning/design/engineering/construction management Lakeland DB Agreement_SIGNED.pdf
Planning/design/engineering/construction management Lakeland Preconstruction Amendment_SIGNED 3_4_26.pdf
Planning/design/engineering/construction management Lakeland Exhibit G Amendment and GMP Exhibits_SIGNED 3_4_26.pdf
Project Budget Mechanical GMP1 Project Budget.pdf
Private Business Use Report Private-Business-Use-Form CB 0105029.pdf
Other LCC0105029-EDGEMBE.pdf
Other Tec Letter of Recommendation of Bid Award.pdf

Transfer Questionnaire

  1. How will the appropriation and/or cash be used?
    • Yes
    • No
    • No
  2. Provide the following information below relative to this budgetary adjustment. For each entry, include a short description of what the dollars will be used to accomplish.
  3. Is there a planned use of expense account category 500 Personal Services?
    • No

Agency Contact

Michael Cooper, Director for Budgeting
Phone: (440) 525 - 7726
Email: mcooper5@lakelandcc.edu

Signatures

David J. Cummins
Date 03/05/2026
Paul Disantis
Date 04/06/2026